Setting the Bolts in the Concret
|

Concret is Ready
|

Base Installed
|

Base & Conduit Installed
|

The Base is Set Above the Concret
|

Sanded and Painted
|

Signal Installed
|

Wire Installed
|

Wire Installed
|

Signal Is Installed
|

Terminating the Wire
|

Terminating the Wire
|

Both Signals
|

L&W Waits for Foundation
|

Trech Missing 2 Pipes
|

Footing for Item # 7
|

Conduit For the 110V
|

Conduit for the TO Signal
|

Digging
|

|

Conduit for the Dawrf Signal
|

Conduits Installed
|

Item #7 in place
|

Ready For Concret
|

Pouring Concret
|

Empty Cabinet
|

Getting There..
|

Future Signals
|

Transformers Installed
|

Signal #2 Wiring
|

AC Split for Street Light
|

House Connection
|

Lit Up
|

Lit Up
|

Prep Site
|

Concerte
|

Hole for Signal #3
|

Bolt Pattern
|

Backside
|

Ready For Concerte
|

Concret for Signal #3
|

Bolts Set
|

Pattern Removed
|

Getting There
|