Project #0726

Step 1- We had to get the cabinet from Steelville MO to Union. When we got to the location to pick up the cabinet a older man came out to tell us that we couldn't pick it up. He said that it was delivered with a crane. Jake and I says that if two guys and a truck can not do it that we don't mess with it.








Step 2- Was to store the cabinet.





Step 3- Was that after the driveway was paved to move the cabinet and mast back. Instead of keeping the mast on the ground, I figured that it would be better to set it up right.





Step 4- Was to rewire it to meet our standards.






Step 5- Was to wire the Power Transfer Relay. I used a ANL-2 relay. This relay is a 110Vac relay.



Step 6- Was to install the transformer and battery charger!




Step 7- Heres the searchlight terminals.



Step 8- To install a Union Switch and Signal company DT-10 timmer relay. This relays is being used to switch the indications.



Step 9- The batteries are installed, and the water levels are within the OK range. This has to be checked every month.


The Finished Product!