| Home | Signal & CTC Projects | Signal Pictures | Other Pictures | Links | Contact Me |
![]() |
I already bought one marker a few months ago so I bought these two to also go on the top of the dwarf. |
![]() |
Heres a pile of parts that I have removed and started to clean. |
![]() |
Here is the inside of the signal after all the lights have been removed. |
![]() |
Heres the front of the CPL with about 75% of the sanding done. Not going to do the base for its going to be replaced in a month.
|
![]() |
The lunar lens removed. |
![]() |
A view of where the small color lens goes. |
![]() |
Here is a shot of where the cup latches to the lens ring. |
![]() |
Heres the cup that the light bulb goes into, note the little rod with the doll rod sticking threw the sides. This latches to
the lens ring. |
![]() |
Heres all the parts that was going to be painted, some are on the second coat but more are one the first coat. |
![]() |
Heres the dwarf starting to come together, half the lights are installed. The rest is still drying. |
![]() |
The final product till I get the top markers from ranken then I have to paint them and install them. Green over White. |
![]() |
Heres the steel bar Ranken made for the dwarf. Total Cost=$25.00 |
![]() |
Ranken also drilled the 1/2" holes on the side to install the pipe fitting. |
![]() |
The three attatched to the top of the dwarf, they have not been apinted but I needed to see if the holes line up befor it was painted. |
![]() |
A close up of the top markers. |
![]() |
Heres the pipe going to the center marker. |